OEB-5 Contained NCM Precursor Line — 6,000 kg/h, Zero Exposure Incidents

Toxic precursor unpacking to sealed sagger filling under a −40 °C dew-point envelope, delivered turnkey to a leading Korean cathode producer.

Project Background

The Plant, the Material, the Target

South Koreaproject location
Precursor → finished NCM handlingproject scope
6,000 kg/hline capacity

The client produces high-nickel NCM precursor and finished cathode powder for domestic cell makers. A capacity expansion meant a second precursor handling line, and their existing multi-vendor line — assembled from European, Japanese and local equipment — had taught them exactly what they did not want: three suppliers on site during commissioning, each responsible for a third of the problems.

For the new line they wanted one partner, one contract, and containment numbers written into the acceptance criteria.

  • OEB-5 containment target based on precursor OEL
  • Moisture pickup below 200 ppm across transfer
  • Full lot traceability from receipt to sagger
  • Performance sign-off on the client's floor, not at the factory gate

The Challenge

What Was Breaking Before We Arrived

['

Operator exposure at bag opening

Precursor bags were opened in a semi-open hood; area monitoring had twice exceeded the internal action limit in the previous year.

', '

Moisture drift in transfer

The existing dilute-phase loop ran on dried compressed air that spiked to −20 °C dew point in summer, forcing batch rejections.

', '

Fragmented batch records

Three control systems meant three record formats — the QA team rebuilt genealogy manually for every audit.

']

The Solution

What We Engineered and Why

Bulk Pro engineered the line as one sealed, dry, negative-pressure system. Bags enter glove-box unpacking stations operating under OEB-5 with bag-in/bag-out liners; transfer runs on a nitrogen loop with dew point held at −40 °C and alarmed interlocks; dosing uses loss-in-weight feeders at ±0.1%; and saggers are filled in a degassing station before moisture-barrier sealing.

The entire line reports to a single DCS/MES layer developed in-house — one batch record format, one alarm philosophy, one interface for the operators.

  • Glove-box stations with secondary HEPA filtration
  • N₂ closed-loop conveying, O₂ monitored
  • Anti-bridging discharge on every Li-salt hopper
  • Battery-Passport-ready MES genealogy

The Results

Measured Before → After Commissioning

['
< 10 μg/m³operator exposure, validated at FAT
', '
−40 °Cdew point held, zero batch rejections
', '
18campaigns with zero cross-contamination
', '
11 weeksfrom mechanical completion to sign-off
']

Client Voice

What the Client Said at Sign-Off

We had three suppliers on the last line and one number to call on this one. That difference showed up in the commissioning schedule — and again at our cell-customer audit, which the batch records passed on the first submission.

Process Engineering Director · Leading Korean cathode producer

Discuss a Precursor Line

24-HOUR ENGINEERING RESPONSE

Shanghai — R&D Center & HQEngineering, process design & project management
Hefei — 77-Acre Manufacturing Base51,000+ ㎡, 8 workshops: fabrication, machining, coating, assembly
Service CommitmentInitial process evaluation within 24 hours of RFQ

Get Your Custom Line Layout

Tell us your target material and capacity — our engineers return a first-pass line layout and spec sheet within 24 hours.

Please select your target material.
Please enter a valid work email.
Allowed: PDF, DWG, Excel.

Strict NDA protection guaranteed for all submitted plant layouts and material specs.

✓ Thank you — your RFQ has been captured. Our engineering team will reply within 24 hours with your line layout.
Chat with an Engineer
WhatsApp Fast Quote