Project Case Studies — Lines Delivered, Numbers Verified
What matters to a plant director is not what a supplier claims, but what the last three projects actually achieved. Background, pain, solution, measured results — unedited.
Cathode · KoreaOEB-5 Contained NCM Precursor Line — 6,000 kg/h, Zero Exposure Incidents
Toxic precursor handling with full moisture isolation, dew point −40 °C, and a MES batch genealogy that passed the client's cell-level audit on the first attempt.
Cathode · GermanyLFP Cathode Expansion — +38% Throughput, Iron Below 50 ppb
Dense-phase conveying and loss-in-weight batching retrofitted around an existing sintering line, with multi-stage magnetic separation taking iron contamination to the client's target window.
Anode · JapanATEX Inert-Gas Silicon-Carbon Handling — 99.2% Availability, Zero Dust Incidents
Explosion-proof nitrogen-loop conveying and dosing for ultrafine, combustible anode powder — from lab scale to 3,000 kg/h production in one engineering phase.
Why These Numbers Matter
Every Case Above Was Measured, Not Estimated
Baseline First
Before engineering starts, we measure your current line's throughput, iron, dust and energy — the Before in every Before→After.
Performance Contracts
Key results are written into the acceptance criteria. The line is not signed off until the numbers are hit on your floor.
Discuss a Similar Project